How are Kansas City electricians ranked? In two separate lists. Residential electricians are ordered by Google rating weighted for review volume: each saved rating is combined with a fixed 4.6-star reference weighted as 100 reviews, (reviews × rating + 100 × 4.6) ÷ (reviews + 100), and a listing needs a high-confidence company and branch match and at least ten reviews (50 of 60 evaluated companies ranked; observations Oct 4, 2026). Commercial electricians are ordered by the number of distinct Kansas City, Missouri commercial sites with an issued electrical permit declaring at least $100,000, applied October 1, 2021 through May 9, 2025; a company needs at least three qualifying sites (34 ranked). Equal values share a competition rank. The formulas have no paid-placement input, and neither list measures workmanship.
Kansas City edition first published October 4, 2026; current residential formula revised October 29, 2026. Residential and commercial rankings use different measures. Calculations were independently reproduced, and source review included representative company and Google-listing checks. Read the dates, scope and limits below.
Two lists, two different questions.
The residential comparison helps a homeowner examine customer-rating evidence alongside service fit and credential records. The commercial comparison examines a reproducible slice of historical electrical permit activity. A single blended score would hide those differences.
Inclusion starts with a recognizable business, evidence of relevant work in the Kansas City market and a matching credential record where one is available. The source package also contains pending and excluded candidates. A missing or unresolved record is not a finding that a company is unlicensed, unsafe or unqualified.
Commercial: historical KCMO permit activity.
The current metric counts distinct commercial-class sites with an issued electrical permit whose declared project value is at least $100,000. The application date window runs from October 1, 2021 through May 9, 2025, inclusive. Permits recorded as Cancelled, Voided-City, Revoked or Expired are excluded. A company needs at least three qualifying sites to appear in the ranking.
- Start with the saved KCMO CPD electrical permit export and the edition’s company-to-filer alias table.
- Filter to the application date window, commercial classification, general or service electrical permit types, a recorded issue date and declared-value threshold. Fire-alarm-only records and cancelled, voided, revoked or expired permits are excluded.
- Normalize project addresses and count each qualifying site once per company, even if it appears on several permits.
- Sort by the site count, highest first. Equal counts share a competition rank: 1, 2, 2, 4. Companies inside a tie are alphabetical.
Credential labels are separate factual fields. They do not add points. Filters narrow the visible list without recalculating ranks.
The geography and the dates matter.
A Kansas-based contractor can appear, but the scored activity comes from Kansas City, Missouri records. Kansas-side permits, permits in other Missouri cities, jobs below the threshold and applications after the window are not represented. The 2026 edition date describes the research package, not a 2026 construction window.
What the metric cannot establish.
The source records issue dates and, for closed permits, completion dates. It does not include inspection results. The data standard’s project-value field does not specify whether it covers the whole project or only the electrical scope. Treat it as an applicant estimate, not a verified electrical contract price. More qualifying permits do not establish better workmanship, safer work, lower prices or present-day staffing capacity.
Does the threshold change the result?
Yes. The source cohort is held constant while the value threshold changes. Individual commercial entries show their alternate position at $50,000 and $250,000, or state that they fall below the three-site floor.
| Declared-value threshold | Companies with at least 3 sites | Use |
|---|---|---|
| $50,000 | 41 | Sensitivity check |
| $100,000 | 34 | Current edition ranking |
| $250,000 | 24 | Sensitivity check |
| Closed with completion date, $100,000 | 25 | Sensitivity check |
The closed-only check keeps the same company cohort, application window and three-site floor but requires a Closed status and a completion date. It is a narrower view of recorded activity, not an inspection or workmanship score.
Identity corrections in this edition.
KC One Service is counted using its own company-name variants. Electric One LLC records are excluded from that entry and evaluated under Electric One’s separate operating identity. Both firms have three qualifying sites and share T-27 at the $100,000 threshold. Electrical Connections has two qualifying sites after a cancelled permit is excluded, so it falls below the ranking floor. The entire order and affected ties have been recalculated.
56 additional source-cohort records below the floor
These records have fewer than three qualifying sites under the current inputs. They are not ranked and are not negative recommendations. Some identity and source checks remain open.
- 435 Electric
- Able Electric
- ACE Electrical Contractors
- AJ Plumbing & Electrical
- American Legacy Construction Group
- Anderson Electrical
- Anthony Plumbing, Heating, Cooling & Electric
- Arrow Circle Electric
- ASAP Electric
- BD Electric
- Bickimer Electric
- Bill Dean Mechanical
- Black & McDonald (US)
- C.M. Mose & Son
- Cerda Electric KC
- Core Electric
- CRH Electric
- Current Solutions Electric
- Dodson Electric
- ECO Electric
- Electrical Connections
- Extreme Electrical Service
- Freedom Electric Services
- Fusion Electric
- Galvin Electric Company
- Geisler Electric
- GRE Electric (Global Rock Enterprise)
- Integrity Electric
- JD Nuñez Electric
- Jeremy Electrical
- JMC Electric
- Joe Kilowatt
- KAL Electric
- Keller Electric
- Landis Electric KC
- Laven Electric
- Local H Electric
- M & E Electric
- McClure Electrical Services
- Merrill Industrial Electric
- Metro Electric
- Parker's Electric
- Price Electrical & General Contracting
- Pure Light Electric
- Reinhold Electric
- Ric Ginn Electric
- Richmond Power
- Rodina Company
- Scott The Electrician
- SJ Electric
- Sync Electric
- Tann Electric
- Tech Electric
- Torgeson Electric
- Wilson Construction & Electric
- WITEC (Whatever It Takes Electrical Contractors)
Residential: ratings with review-volume context.
Each Google listing was matched to its company and branch, with its link, rating, review count, observation date and matching rationale recorded. The listing must be a high-confidence match to the company and branch, with at least ten reviews, to enter the scored cohort. Multi-trade companies are labelled because their reviews can cover HVAC, plumbing or other services.
Every eligible candidate must have either a valid observation or an explicit, dated reason why a usable listing could not be matched. We do not calculate an edition from whichever companies happened to be checked first. An unobserved company is not given a zero rating.
The weighted value is B = (100 × 4.6 + n × r) / (100 + n), where n is the listing’s review count and r is its rating. The fixed reference of 4.6 stars and the weight of 100 reviews reduce the influence of small review samples; both are editorial choices, not a guarantee of statistical accuracy.
Method change, October 12, 2026 (KC-2026Q4-2). The first release of this edition pulled ratings toward the cohort median (4.85) with a weight of 25. Because most ratings in Kansas City cluster near 5.0, that let a perfect score on a few dozen reviews outrank near-perfect ratings across thousands. The fixed 4.6 reference gives sustained review volume more weight. The observations, recorded October 4, 2026, did not change. The original order is archived.
Order and ties use B rounded to three decimal places. Equal rounded values share a competition rank and are alphabetical inside the tie. The displayed 0–100 score is 100 × (B − 4), clipped to that range. Display rounding does not change the underlying tie rule.
Customer ratings are opinions about a listing. They are not inspections or proof of electrical competence. Neither a high rating nor an active credential record replaces a project-specific scope, insurance check or discussion with the contractor.
For this edition, 50 of 60 eligible companies met the rating and matching requirements; the cohort median rating is 4.85, shown for context; it is no longer used in the formula. Observations were recorded on Oct 4, 2026. Eight listings had fewer than ten reviews, and two could not be confidently located. All ten remain visible without a rank.
Small score gaps should not be read as meaningful differences in contractor quality. The reference rating, weight and review floor are editorial choices. The October 29 method increases the weight from 50 to 100; the dated comparison below reports its effect using the same observations. Ratings may change after the observation date.
October 29, 2026: residential reference weight increases to 100.
Current residential lists combine each saved Google rating with a fixed 4.6-star reference weighted as 100 reviews: (reviews × rating + 100 × 4.6) ÷ (reviews + 100). The reference weight is part of the calculation, not an extra set of customer reviews. The larger weight reduces the influence of small samples and puts more emphasis on sustained review volume. It pulls ratings above 4.6 down toward the reference and ratings below 4.6 up toward it.
This edition recalculates the same 463 eligible listings across seven metros. Kansas City observations remain dated October 4; the other six metros retain October 27 observations. Branches, residential eligibility, minimum ten reviews and three-decimal competition ties are unchanged. This is a method revision, not a fresh review collection. The separate composite Benchmark score and commercial permit rankings are unchanged.
| Metro | Matched listings | Ranks changed | Largest rank move | Previous order |
|---|---|---|---|---|
| Kansas City | 50 | 41 | 6 | 50-review archive |
| Dallas–Fort Worth | 97 | 71 | 12 | 50-review archive |
| Houston | 87 | 61 | 8 | 50-review archive |
| Minneapolis–St. Paul | 47 | 30 | 8 | 50-review archive |
| Denver | 95 | 65 | 17 | 50-review archive |
| Columbus | 33 | 11 | 4 | 50-review archive |
| Nashville | 54 | 39 | 8 | 50-review archive |
318 of 463 listings (68.7%) change rank. Kansas City’s leader changes from East Side Electric to C.M. Mose & Son; Nashville’s changes from Greenway Electric of Nashville to Pioneer Heating, Cooling, Electrical & Plumbing. The other five leaders remain the same. These movements describe the calculation’s sensitivity, not evidence that the new method predicts workmanship or future ratings better. A tie at tenth can make a top ten contain more than ten listings.
Kansas City uses method KC-2026Q4-3; the six expansion metros use RES-4.6-100-2026-10-29. Their previous orders remain available in the links above, and Kansas City’s original October 4 order is also preserved. Review authenticity, electrical-only experience, price and current availability still require separate checks.
Kansas City project planning.
The licensing and permit guide explains state and local authority, credential checks and dated fee schedules. The cost guide separates public planning ranges from observed installation prices. Both support the residential and commercial comparisons; neither changes ranking inputs or turns permit valuation into a verified contract price.
Sources and how to read them.
| Source | What it contributes | Limit |
|---|---|---|
| KCMO licensed-contractor search | Company license records and dates | A dated city record; not a metro-wide license or quality finding |
| Johnson County contractor search | Contractor status and class | Recheck current status and project jurisdiction |
| Missouri license search | Statewide record where an exact match is supported | The licensee-to-company link needs its own evidence |
| KCMO CPD permit dataset | Historical issued electrical permits and declared project values | KCMO only; no inspection results; source last updated May 9, 2025 |
| Company websites and project sources | Advertised services, contact addresses and project descriptions | Company-advertised claims; not verified delivery or current availability |
Each entry exposes its source links and observation dates. “Listed address” may be an address from a company website or license record; it is not necessarily a walk-in office. The illustrative category photographs do not depict a listed company or a verified project.
Download the limited public-record comparison data. This export includes the displayed company identifiers, corrected commercial counts and source links. It contains no Google ratings or review counts, no individual licensee details and no private research notes.
Editorial controls and corrections.
The formulas have no paid-placement input. A service filter does not buy or change a position. The publication uses a brand editorial byline; the methods, source dates and corrections supply the accountability for each edition.
Corrections must identify the affected claim and supporting source. A changed input triggers a recalculation of the entire relevant cohort, including ties, counts and sensitivity results. See the current correction process.
City of Kansas City data attribution
This site provides applications using data that has been modified for use from its original source, www.data.kcmo.gov, the official open data website of the City of Kansas City. The City of Kansas City makes no claims as to the content, accuracy, timeliness, or completeness of any of the data provided at this site. The data provided at this site is subject to change at any time. It is understood that the data provided at this site is being used at one's own risk.
Benchmark score, introduced Oct 13, 2026; does not replace the dated Kansas City residential and commercial editions.
The Benchmark score covers Kansas City licensed-business records (full records and registry records from the Kansas City, Missouri, Johnson County and Independence lists, with Lawrence-area listings assigned to Kansas City), Topeka list records, and the discovery metros (Tulsa, Oklahoma City, Wichita, Omaha, St. Louis, Des Moines, Springfield, Lincoln, Northwest Arkansas and Columbia). Google Maps listings that match no license-list record get a listing record and a score but are never ranked among licensed businesses. The score runs from 0 to 100 and is computed only for a record with a matched Google Maps listing. It does not replace the dated Kansas City residential and commercial editions: those keep their own dated formula and order.
- Reputation, 50 points. A Bayesian rating, (v × R + 50 × 4.6) ÷ (v + 50), where R is the Google rating and v the review count: a fixed 4.6 reference weighted as 50 reviews. It earns up to 35 points on a straight line from 3.5 (0 points) to 5.0 (35 points). Review volume earns up to 15 points on a log scale, log(1 + v) ÷ log(1 + 500), capped at 500 reviews.
- Presence, 20 points. Has a website (7), the website lists the trade’s core service (7), a street address is published (6).
- Credibility, 20 points. A match to a license, registration, manufacturer or state record, where the site has one for that market.
- Scale, 10 points. Where the review count sits among the scored listings in the same metro (percentile; ties count half).
- Unknown inputs are left out: the score is the points earned divided by the points possible on the inputs we observed, scaled to 100. Data confidence, shown with every score, is the number of inputs observed out of the number possible.
Credibility uses the license-list match: it is observed for every Kansas City and Topeka licensed record (20 points when a list entry is held). No license list has been matched for the discovery metros yet, so there those 20 points are not observed and are left out until one is.
Listings come from a Google Maps export. Each listing is kept only if it is operational and its Google category fits the trade; duplicate listings are dropped by place ID. A listing is assigned to the nearest metro center within 60 miles, then matched to an existing record by website domain first and by normalized name and city second. An unmatched listing becomes a lightweight record with “not observed” for everything the listing does not show. Phone numbers are never published.
City lists with at least 3 scored companies are ordered by the score and show each company’s rank and the number scored (for example, “#2 of 14”). Cities with fewer keep their earlier order and title. Google listings were read Oct 13, 2026 (1088 listings).
Six metro residential editions: scope and eligibility.
The first editions were published October 27, 2026 with a 50-review reference weight and remain archived. From October 29, 2026, Dallas–Fort Worth, Houston, Minneapolis–St. Paul, Denver, Columbus and Nashville use the same fixed-prior residential formula: (reviews × rating + 100 × 4.6) ÷ (reviews + 100). A ranked listing must advertise residential electrical work, have independently corroborated branch identity, a valid rating and at least ten reviews. A metro needs at least ten eligible listings before a residential ranking is published. Other evaluated business records remain visible without a residential rank.
These are bounded discovery samples, not market censuses. Fifteen principal-city/suburb queries per metro cover electrician, electrical contractor, residential and commercial electrician, EV charger installation, generator installation and panel upgrade terms. Dallas–Fort Worth used a maximum of 60 results per query; the remaining metros used 45. Duplicate place identifiers, out-of-area listings, supply houses, unrelated trades and possible personal-name holders are dispositioned before publication. Website access failures and unknown scope are recorded, not converted to negative findings.
Exact or documented company identities must agree with the city or address before an authority record is joined. Unmatched records do not mean unlicensed. Issuing-authority match points in the separate Benchmark score measure available evidence; they do not guarantee current project authorization. Date, status, expiry and jurisdiction remain visible on records. Residential ordering receives no license bonus. In the six new metros, a listing enters an ordered Benchmark comparison only with independently corroborated branch identity, electrical scope on its primary website, a valid rating and at least ten reviews. City comparisons need at least three such listings. A numeric Benchmark score is displayed only with at least three observed score inputs. Other records show “Unscored” with their observed-input count and receive no Benchmark comparison position. The dated display correction below explains this rule.
The residential order uses the adjusted value rounded to three decimals; equal rounded values share a competition rank and are alphabetical within the tie. Filtering preserves those edition positions. Each metro retains a dated edition archive. Rank percentile is 100 × (number ranked − rank) ÷ (number ranked − 1), so first place is 100; it compares this sample only.
Company relationships do not affect inclusion, scores or order: all companies use the same evidence and criteria, with no paid rank or hidden bonus. A material paid relationship must be disclosed separately if present. Company-advertised services are unverified; customer ratings can cover multiple trades.
Research pages publish aggregate calculations, denominators and limitations. Their CSV tables contain aggregate results only; individual Google observations, review text, personal contacts and private matching evidence are excluded. The original October 27 expansion left Kansas City unchanged. The separately dated October 29 residential revision below now applies across all seven residential cohorts; source observations remain unchanged.
October 28, 2026: minimum evidence for a displayed score.
A displayed composite Benchmark score now requires a numeric calculation and at least 3 observed score inputs. With fewer inputs, the page says “Unscored” and keeps the observed-input count visible. An unscored value is neither zero nor 100 and is excluded from score-summary denominators. This prevents a website or address alone from appearing to earn a perfect score.
In the 1280 company listings from the six October 27 metro editions, 48 are now unscored: 45 previously displayed 100/100 from one or two inputs, and 3 had no numeric score. The other 1232 retain their displayed values. No residential, metro Benchmark or city ranking position changed. Google-review and license-match statistics keep their own existing denominators.
The underlying formula, raw calculations and October 27 source observations are preserved. Archived residential lists retain their frozen positions and observations, while applying this corrected score-display rule. JSON and CSV company downloads continue to omit numeric Benchmark scores and individual Google observations; they retain the observed-input confidence count. This is a presentation correction, not a new rating observation or a change to residential weights.
October 28, 2026: company website follow-ups.
Eight company records now have later, source-linked notes about advertised electrical services. Two previously missing company websites were matched; three records have website links withheld because the reviewed pages did not establish the listed electrical company. These notes distinguish company-level advertising from a corroborated branch address. They do not change the October 27 score inputs, licensing observations or frozen ranks. Current and archived comparison pages link to the dated follow-up. JSON downloads include a separate website-follow-up field; JSON and CSV website links reflect the two additions and three withheld links. Original source observations are preserved.
October 28, 2026: license and office-address follow-ups.
TDLR license 31090 links CC Electrical Solutions to CCE SOLUTIONS at the listed McKinney address. Asplundh Power’s office map also corroborates the EPS location in Sugar Land. The company pages link these later sources. CC’s earlier license table remains labeled with its October 27 date; its later credential appears separately in the page and JSON website-follow-up field. This check does not refresh score inputs, license-match totals or ranking positions, and it makes no insurance or disciplinary-history claim.
October 29, 2026: metro rankings and publication floor.
The eleven metros established before the October 27 expansion now need at least ten companies with a matched Google listing, a numeric Benchmark score and at least three observed score inputs to publish a metro ranking. All eleven meet that floor: Tulsa (86); Oklahoma City (147); Wichita (62); Omaha (87); St. Louis (99); Des Moines (78); Springfield (46); Lincoln (51); Northwest Arkansas (94); Columbia (22); Topeka (28). Each table displays its score, observed-input confidence and original source date. This general electrical-company comparison does not establish residential scope.
Profiles below that evidence floor and city pages with fewer than three qualifying companies receive noindex and are omitted from the sitemap (426 routes). Topeka’s 2024 license-list records are retained as dated reference pages with noindex; its 28 Google listings form a separate comparison without inferred license matches. If a legacy metro falls below ten qualifying companies, its hub and thin profiles receive noindex until enough evidence exists.
This release creates metro comparison positions from existing scores. It does not change score weights, source observations, Kansas City ranks, the six October 27 metro editions or their archives. The two Kansas City comparison pages now begin with top-ten tables; “Best for” labels summarize their existing company-advertised service fields.
October 29, 2026: Austin, San Antonio and Phoenix residential shortlists.
The three additions use the accepted residential method: a fixed 4.6-star reference weighted as 100 reviews, at least ten reviews, company-advertised residential electrical scope and a corroborated branch address. Equal adjusted scores at three decimals share a competition rank; tied names are alphabetical. The dated cohort contains Austin (12); San Antonio (27); Phoenix (36), with observations from October 29.
These are bounded metro shortlists. The discovery queries included central cities and suburbs, but query city names are not an eligibility boundary. Nearby or unresolved listings remain pending when branch, geography or service scope is not established. Website access and source gaps mean omitted firms may rank higher after verification. Current company license standing is not established, and missing credentials are not treated as unlicensed operation.
The source cohort and m100 ranking inputs are retained as a dated snapshot. Existing Kansas City and October 27 metro observations, current ranks and historical editions are preserved. These additions do not change the separate composite Benchmark formula.
Method and data change log.
Every change to a formula, threshold, source or published dataset is dated here. Rankings change only in a new edition or a disclosed, dated method revision.
| Date | Change | Effect on ranks |
|---|---|---|
| Oct 29, 2026 | Increase residential reference weight from 50 to 100 across seven metros. Same observations and eligibility; prior orders archived. Comparison and limits. | 318 of 463 positions change; two leaders change |
| Oct 29, 2026 | Publish eleven legacy metro Benchmark comparisons and apply the evidence-based indexing floor. Scope and route policy. | New metro positions from held scores; existing dated rankings unchanged |
| Oct 28, 2026 | Require at least three observed inputs and a numeric calculation for displayed composite scores. 48 of 1280 expansion listings now show “Unscored”; confidence and raw calculations retained. Correction details. | No ranking positions changed; archived lists use the corrected display rule |
| Oct 13, 2026 | Benchmark score introduced for Kansas City and Topeka licensed records and the discovery metros, computed from matched Google Maps listings (formula). City lists with three or more scored companies, including the Kansas City licensed-electrician city pages, are ordered by it. | None for the Kansas City editions |
| Oct 12, 2026 | Residential formula revised (KC-2026Q4-2): ratings are pulled toward a fixed 4.6 reference with a weight of 50 reviews, replacing the cohort median with a weight of 25. The original order is archived. | Residential order changed; see the archived edition |
| Oct 11, 2026 | Company records published for all 87 compared companies; Johnson County license file rechecked and changes logged on the change log; Johnson County Class DE registry page and published statistics added. | None |
| Oct 4, 2026 | Commercial measure counts issued KCMO permits only, excluding cancelled, voided, revoked and expired records; identity corrections listed on the change log. | Commercial order recalculated |
| Oct 4, 2026 | First published edition (method KC-2026Q4-1). | Initial ranks |